Statistic rows and columns

The following table describes the statistic rows and columns that are available in the project and element collections (rows) and when comparing projects (columns).

Row/Column

Description

Average

The average value for the projects being compared.

Baseline to average

Shows how the baseline project compares to the average of all the other projects being compared expressed as a percent. For example, the baseline project may be 98% of the average.

Baseline to median

Shows how the baseline project compares to the median project expressed as a percent. For example, the baseline project may be 85% of the median project.

CoV Coefficient of variation 

Measures risk and uncertainty by showing the ratio of a field's standard deviation (spread of uncertainty) to it's mean (expected cost), indicating relative variability rather than absolute values. CoV = (Standard deviation / Average) * 100

High

The high value for the projects being compared.

Low

The low value for the projects being compared.

Median

The median value for the projects being compared.

Spread

The difference between the high and low values for the projects being compared.

Standard deviation

The standard deviation across the projects being compared.

Standard deviation %

The standard deviation percentage across the projects being compared.

Total

The total for all the projects being compared.

Ignore zeros tip

The Ignore zeros check circle determines whether the statistics include or exclude projects or elements that contain zeros. For example, if a project in your comparison contains a zero and is not applicable to your scenario (e.g., you are trying to obtain an average of all the projects with values), select the Ignore zeros check circle. However, if it does apply and you want it included in the Average and other statistic calculations, clear the Ignore zeros check circle.

Statistics always ignore null (blank) values. Depending on your suppression settings, some zero values can appear blank. You can download an import template for a project to see what values the fields actually contain.

Ignore baseline tip

The Ignore baseline check circle determines whether the statistic values include or exclude the baseline project or baseline element. Select this check circle to exclude the baseline project or element from the statistic values. Otherwise, clear this check circle to include the baseline project or element in the statistic calculations. This setting applies anywhere that statistics are visible in Cortex Project History.